Hi everyone, and welcome to The Safety Artisan, a series of #Safety #Engineering #Training videos. I’m Simon and I’m a safety engineer and consultant with over 20 years experience working in systems safety, safety engineering, safety in design and a whole bunch of related disciplines including software safety.

The aim of my business is to provide professional, pragmatic and impartial #Safety #Engineering #Training. But what does that really mean? Well, in my time as a safety engineer and consultant I’ve worked with lots of clients doing many different things.

I often find that clients are making two kinds of mistake

They’re either not doing enough work to meet their obligations, or they’re doing too much work. The first one is perhaps obvious, as safety standards and safety legislation are very demanding. People aren’t always aware of what their obligations are, and therefore they’re not always meeting them.

But, when you’re a consultant and, it must be said demanding a lot of money from clients to do this work, I think the suspicion is sometimes that the consultant is just asking to do more work to get more money.

Ethical consulting

Now, that’s not actually what ethical consultants do, but I’m sure not everyone believes that. So, here, I hope to get away from that paradigm, and we can actually share information just because it’s factual. Accepting what I say doesn’t mean that I’ll take any more money off you and you can check out what you see and decide whether you like it. The other issue is perhaps less obvious: people do too much work. But the reality is there are people all over the place doing safety work that just doesn’t make a difference – i.e. it doesn’t demonstrate that you’ve met requirements or that risk is managed.

Asking questions can be risky

And that’s also a difficult sell because questioning what the tribe is doing, questioning the culture of the organization is difficult and frankly risky for individuals. So they don’t want to do it. Again, here in the privacy of a video, it’s just you and me. I can tell you stuff, you can give me feedback on the website or at Patreon.com. You can ask questions and hopefully, we can get to a better understanding of the facts, without worrying about sums of money changing hands or convincing your peers that change is necessary.

Check me out and what I do

So, I hope you find this helpful and I hope you’re able to support me at Patreon: that’s ‘Safety Artisan’ on Patreon.com, and also the supporting website www.SafetyArtisan.com. You can always look me up on LinkedIn and check out my experience and qualifications.

Thanks very much for listening and I look forward to talking to you again.

#Safety #Engineering #Training

#Safety #Engineering #Training

Safety Artisan training videos are available on Patreon.

Become a Patron!

Transcript: Sub-System Hazard Analysis (T204)

Here is the full transcript: Sub-System Hazard Analysis.

In the video lesson, The Safety Artisan looks at Sub-System Hazard Analysis, or SSHA, which is Task 204 in Mil-Std-882E. We explore Task 204’s aim, description, scope and contracting requirements. We also provide value-adding commentary and explain the issues with SSHA – how to do it well and avoid the pitfalls.

Introduction

Hello, everyone, and welcome to the Safety Artisan, where you will find professional, pragmatic, and impartial instruction on all things system safety. I’m Simon – I’m your host for today, as always and it’s the fourth of April 22. With everything that’s going on in the world, I hope that this video finds you safe and well.

Sub-System Hazard Analysis

Let’s move straight on to what we’re going to be doing. We’re going to be talking today about subsystem hazard analysis and this is task 204 under the military standard 882E. Previously we’ve done 201, which was preliminary hazard identification, 202, which is preliminary hazard analysis, and 203, which is safety requirements hazard analysis. And with task 204 and task 205, which is system has analysis, we’re now moving into getting stuck into particular systems that we’re thinking about, whether they be physical systems or intangible. We’re thinking about the system under consideration and I’m really getting into that analysis.

Topics for this Session

So, the topics that we’re going to cover today, I’ve got a little preamble to set things in perspective. We then get into the three purposes of task 204. First, to verify compliance. Secondly, to identify new hazards. And thirdly, to recommend necessary actions. Or in fact, that would be recommend control measures for hazards and risks. We’ve got six slides of task description, a couple of slides on reporting, one on contracting, and then a few slides on some commentary where I put in my tuppence worth and I’ll hopefully add some value to the basic bones of the standard. It’s worth saying that you’ll notice that subsystem is highlighted in yellow and the reason for that is that the subsystem and system hazard analysis tasks are very, very similar. They’re identical except for certain passages and I’ve highlighted those in yellow. Normally I use a yellow highlighter to emphasize something I want to talk about. This time around, I’m using underlining for that and the yellow is showing you what these different for subsystem analysis as opposed to system. And when you’ve watched both sessions on 204 and 205, I think you’ll see the significance of why I’ve done.

Preamble – Sub-system & System HA

Before we get started, we need to explain the system model that the 882 is assuming. If we look on the left-hand side of the hexagons, we’ve got our system in the centre, which we’re considering. Maybe that interfaces with other systems. They work within operating environment; hence we have the icon of the world, and the system and maybe other systems are there for a purpose. They’re performing some task; they’re doing some function and that’s indicated by the tools. We’re using the system to do something, whatever it might be.

Then as we move to the right-hand side, the system is itself broken down into subsystems. We’ve got a couple here. We’ve got sub-system A and B and then A further broken down into A1 and A2, for example. There’s some sort of hierarchy of subsystems that are coming together and being integrated to form the overall system. That is the overall picture that I’d like to bear in mind while we’re talking about this. The assumption in the 882, is we’re going to be looking at this subsystem hierarchy bottom upwards, largely. We’ll come on to that.

System Requirements Hazard Analysis (T204)

The purpose of the task, as I’ve said before, it’s threefold. We must verify subsystem compliance with requirements. Requirements to deal with risk and hazards. We must identify previously unidentified hazards which may emerge as we’re working at a lower level now. And we must recommend actions necessary. That’s further requirements to eliminate all hazards or mitigate associated risks. We’ll keep those three things in mind and that will keep coming up.

Task Description (T204) #1

The first of six slides on the task description. Basically, we are being told to perform and document the SSHA, sub-system hazard analysis. And it’s got to include everything, whether it be new developments, COTS, GOTS, GFE, NDI, software and humans, as we’ll see later. Everything must be included. And we’re being guided to consider the performance of the subsystem: ‘What it is doing when it is doing it properly’. We’ve got to consider performance degradation, functional failures, timing errors, design errors or defects, and inadvertent functioning – we’ll come back to that later. And while we’re doing analysis, we must consider the human as a component within the subsystem dealing with inputs and making outputs. If, of course, there is an associated human. We’ve got to include everything, and we’ve got to think about what could go wrong with the system.

Task Description (T204) #2

The minimum that the analysis has got to cover is as follows. We’ve got to verify subsystem compliance with requirements and that is to say, requirements to eliminate hazards or reduce risks. The first thing to note about that is you can’t verify compliance with requirements if there are no requirements. if you haven’t set any requirements on the subsystem provider or whoever is doing the analysis, then there’s nothing to comply with and you’ve got no leverage if the subsystem turns out to be dangerous. I often see it as it gets missed. People don’t do their top-down systems engineering properly; They don’t think through the requirements that they need; and, especially, they don’t do the preliminary hazard identification and analysis that they need to do. They don’t do Task 203, the SRHA, to think about what requirements they need to place further down the food chain, down the supply chain. And if you haven’t done that work, then you can’t be surprised if you get something back that’s not very good, or you can’t verify that it’s safe. Unfortunately, I see that happen often, even on exceptionally large projects. If you don’t ask, you don’t get, basically.

We’ve got two sub-paragraphs here that are unique to this task. First, we’ve got to validate flow down of design requirements. “Are these design requirements valid?”, “Are they the right requirements?” From the top-level spec down to more detailed design specifications for the subsystem. Again, if you haven’t specified anything, then you’ve got no leverage. Which is not to say that you have to dive into massive detail and tell the designer how to do their job, but you’ve got to set out what you want from them in terms of the product and what kind of process evidence you want associated with that product.

And then the second sub-paragraph, you’ve got to ensure design criteria in the subsystem specs have been satisfied. We need to verify that they’re satisfied, and that V and V of subsystem mitigation measures or risk controls have been included in test plans and procedures. As always, the Mil. standard 882 is the American standard, and they tend to go big on testing. Where it says test plans and procedures that might be anything – you might have been doing V and V by analysis, by demonstration, by testing, by other means. It’s not necessarily just testing, but that’s often the assumption.

Task Description (T204) #3

We must also identify previously unidentified hazards because we are now down at a low level of detail in a subsystem and stuff probably will emerge at that level that wasn’t available before. First, number one, we’ve got to ensure the implementation of subsystem design requirements and controls. And ensure that those requirements and controls have not introduced any new hazards, because very often accidents occur. Not because the system has gone wrong – the system is working as advertised – but the hazards with normal operation maybe just weren’t appreciated and guarded against or we just didn’t warn the operators that something might happen that they needed to look out for. A common shortfall, I’m afraid.

And number two, we’ve got to determine modes of failure down to component failure and human errors, single points of failure, common-mode failures, effects when failures occur in components, and from functional relationships. “What happens if something goes wrong over on this side of the system or subsystem and something else is happening over here?” What are those combinations? What could result? And again, we’ve got to consider hardware and software, including all non-developmental type stuff, and faults, and occurrences. Again, I see very often, buyers/purchases don’t think about the off the shelf stuff in advance or don’t include it. And then sometimes also you see contractors going “This is off the shelf, so we’re not analysing it.” Well, the standard requires that they do analyse it to the extent practicable. And they’ve got to look at what might go wrong with all of this non-development to stuff and integrate the possible effects and consider. That’s another common gotcha, I’m afraid. we do need to think about everything, whether it’s developmental or not.

Task Description (T204) #4

And then part C, recommending actions necessary to eliminate hazards if we can. Very often we can’t, of course, and we have to mitigate. We must reduce or minimize the associated risk of those hazards. In terms of the harm that might come to people. We’ve got to ensure that system-level hazards, it says attributed. Maybe we believe when we did the earlier analysis that the subsystem could contribute to a higher-level hazard, or maybe we’ve allocated some failure budget to this particular subsystem, which it has got to keep to if we’re going to meet the higher-level targets. You can imagine lots of these subsystems all feeding up a certain failure rate and different failure modes. And overall, when you pull it all together, we may have to meet some target or reduce the number of failures in their propagation upwards in order to manage hazards and risks. We’ve got to make sure that we’ve got adequate mitigation controls of these potential hazards are implemented in the design.

If we think back to the hierarchy, we prefer to fix things in the design, eliminate the hazard if possible, or make changes to the design to eliminate or reduce the hazard, rather than just rely on human beings to catch the problem and deal with it further downstream. It’s far more effective and cheaper, in the long run, to fix things in design they are more effective controls. Certainly, in this standard in Australian law, and in the UK and elsewhere, you will find either regulations or law or codes of practice or recognized and accepted good practice that says, “You should do this”. It’s a very, very common requirement and we should pretty much assume that we have to do this.

Task Description (T204) #5

Interesting clause here in 2.2, it says if no specific hazard analysis techniques are directed or the contractor wants to take a different route to what is directed, then they’ve got to obtain approval from the program manager. If the PM (Project Manager) hasn’t specified analysis techniques, and they may not wish to, they may just wish to say you’ll do whatever analysis is required in order to identify hazards and mitigate them. But in many industries, there are certain ways of doing things and I’ve said before in previous lessons, if you don’t specify that you want something, then contractors will very often cut the safety program to the bone in order to be the cheapest bid. the customer will get what they prioritize. If the customer prioritizes a cheap bid and doesn’t specify what they want, then they will get the bare minimum that the contractor thinks they can get away with. If you don’t ask, you don’t get – Becoming a theme that isn’t it?

Task Description (T204) #6

Let’s move on to 2.3. Returning to software, we’ve got to include that. The software might be developed separately, but nevertheless, the contractor performing the SSHA shall monitor the software development, shall obtain data from each phase of the software development process in order to evaluate the contribution of the software to the subsystem hazard analysis. There’s no excuse for just ignoring the software and treating it as a black box. Of course, very often these days the software is already developed. It’s a GFE or NDI item, but there still should be evidence available or you do a black-box analysis of the subsystem that the software is sitting in. Again, if the software developer reports any identified hazards, they’ve got to be reported to the program manager in order to request appropriate direction.

This assumes a level of interaction between the software developers right up the chain to the program manager. Again, this won’t happen unless the program manager directs it and pays for it. If the PM doesn’t want to pay for it, then they are either going to have to take a risk on not knowing about the functionality of the software that’s hidden within the subsystem. Or they’re going to deal with it some other way, which is often not effective. The PM needs to do a lot of work upfront in order to think what kind of problems there might be associated with a typical subsystem of whatever kind it is we’re dealing with. And think about “How would I deal with the associated risks?” “What’s the best way to deal with them in the circumstances?” If I’m buying stuff off the shelf and I’m not going to get access to hazard analysis or other kinds of evidence, how am I going to deal with them? Big questions.

And then 2.4, the contractor shall update the SSHA following changes, including software design changes. Again, we can’t just ignore those things.  That’s slide six out of six. Let’s move on to reporting.

Reporting (T204) #1

The first slide, contractor’s got to prepare a report that contains results from the task, including within the system description, physical and functional characteristics of the system, a list of the subsystems, and a detailed description of the subsystem being analysed, including its boundaries. And from other videos, you’ll know how much and how often I emphasize knowing where the boundaries are because you can’t really do effective safety analysis and safety management on an unbounded system. It just doesn’t work. There’s a requirement here for quite a lot of information reference to more detailed descriptions as they become available. The standard says they shall be supplied. That’s a lot of information that probably texts and pictures of all sorts of stuff and that’s going to need to go into a report. And typically, we would expect to see a hazard analysis report or a HAR with this kind of information in it. Again, if the PM/customer doesn’t specify that HAR, then they’re not going to get it and they’re not going to get textual information that they need to manage the overall system.

Reporting (T204) #2

So, if we move on to parts B and C of the reporting requirement. We’ve got to describe hazard analysis methods and techniques, provide a description of each method and the technique used, and a description of the assumptions made. And it says for each qualitative or quantitative data. This is another area that often gets missed. If you don’t know what techniques have been used and you don’t know the assumptions that almost certainly that subsystem analyser will have to make because they probably don’t have visibility in the rest of the system. If you don’t have that information, it becomes very difficult to verify the hazard analysis work and to have confidence in it.

And the hazard analysis results. Content and format vary. Something else the PM is going to think about and specify upfront. Then results should be captured the hazard tracking system. Now, usually, this hazard tracking system is hazard log. It might be a database, a spreadsheet or even a word document, or something like that. And usually, in the hazard tracking system, we have the leading particulars. We don’t always have, in fact, we shouldn’t have, every little piece of information in the hazard tracking system because it will quickly become unwieldy. Really, we want the hazard log to have the leading particulars of all the hazards, causes, consequences and controls. And then the hazard log should refer out to that hazard analysis report or other reports and data, whatever they’re called, other records.

If we go back up, this reemphasizes the kind of detail that’s here in 2.5 A. That really shouldn’t be going in the hazard log. That should be going in a separate report which the hazard log/the hazard tracking system refers to. Otherwise, it all gets that unwieldy.

Contracting

I’ve said repeatedly the PM needs to think about this and ask for that.

Contracting; The standard assumes that the information in A to H below is specified way up front in the request for proposal. That’s not always possible to do in full detail, but nevertheless, you’ve got to think about these things really early and include them in the contractual documentation. And again, if your if you’re running a competition, by the time you get to the final RFP, you need to make sure that you’re asking for what you really need. maybe run a preliminary expression of interest or pre-competition exercise in order to tease out, detect. We’ve got to impose task 204 (A.) as a requirement. We may have to specify which people we want to involve, which functional specialists, which discipline specialists (B.). We want to get involved to address this work. Identification of subsystems to be analysed (C.). Well, if you don’t know what the design is upfront, we can’t always do that, but you could say all.

You may specify desired analysis methodologies and techniques (D.). And again, that’s largely domain dependent. We tend to do safety in certain ways in different worlds, in the air world is done in a particular way. in the maritime world, it’s a different way. With Road or Off-Road Vehicle, it’s done in a particular way, etc, etc., whatever it might be. Chemical plant, whatever. If they’re known hazards, hazardous areas or other specific items be examined or excluded (E.) because they’re covered adequately elsewhere. The PM or the client has got to provide technical data on all those non-development developmental items (F.), particularly if they’re specifying that the contractor will use them. If the client says “You will use this. You will use these tires, therefore, this data with these tires” or whatever it might be, you’re going to – we want a system that’s going to use to standardized spares of standardized fuel or whatever it might be or is maintainable by technicians and mechanics with these standard skill sets. There may be all sorts of reasons for asking or forcing contracts to do certain things, in which case the purchaser is responsible for providing that data.

And again, many purchases forget to do that entirely or do it very badly, and then that can cripple a safety program. What’s the concept of operations (G.). What are we going to do with this stuff? What’s the context? What’s the big picture? That’s important. And any other specific requirements (H.). What risk matrix? What risk definitions are we using on this program? Again, important otherwise, different contractors do their own thing, or they do nothing at all. And then the client must pick up pieces afterwards, which is always time-consuming and expensive and painful. And it tends to happen at the back of a program when you’re under time pressure anyway. It’s never a happy place to be. do make sure that clients and purchases that you’ve done your homework and specified this stuff upfront, even if it turns out to be not the best thing you could have specified, it’s better to have an 80 percent solution that’s pretty standard and locked down.

Commentary #1

That’s the wording that’s in the task with some commentary by myself. Now some additional commentary. It says right up front, areas to consider include performance, performance degradation, functional failures, timing errors, design errors or defects and inadvertent function. What we have here basically is a causal analysis, there will be some simple techniques that you can use to identify this kind of stuff. Something like a functional failure analysis or a failure modes effects analysis, which is like an FFA, but an FMEA requires design to work on. And, FMEA, a variant of FME is FMECA, where we include the criticality of the failure as it possibly propagates out the hierarchy of the system.

These sorts of techniques will think about what could go wrong, no function when required, inadvertent function – the subsystem functions when it’s not supposed to – and incorrect function, and there’s often multiple versions of incorrect function. considering all of those causes, all of those failure modes and if we’re doing a big safety program on something quite critical, very often the those identified faults and failures and failure modes will feed into the bottom of a fault tree where we have a hierarchical build-up of causation and we look at how redundancy and mitigation and control measures mitigate those low-level failures and hopefully prevent them from becoming full-blown incidents and accidents.

And these techniques, particularly the FFA in the FMEA, are also good for hazard identification and for investigating performance and non-compliance issues. you can apply an FFA and FMEA those type of techniques to a specification and say “We’ve asked for this. What could happen if we get what we ask for?” What could go wrong? And, what could go wrong with these requirements?

Commentary #2

Now, the second part that I’ve chosen to highlight a consideration of the human within a subsystem and this is important. Traditionally, it’s not always been done that well. Human factors, I’m glad to say is becoming more prominent and more used both because in many, many systems, human is a key component, is a key player in the overall system. And in the past, we have tended to build systems and then just expect the human operator and maintainer to cope with the vicissitudes of that system. maybe the system isn’t that well designed in terms of it is not very usable, its performance depends on being lovingly looked after and tweaked and maybe systems are vulnerable to human error, and even induce human error. We need to get a lot better at designing systems for human use.

So, we could use several techniques. We could use a HAZOP, a hazard analysis operability study to consider information flows to and from the human. There are lots of specialist human factors analyses out there. And I’m hoping to run a series of human factors sessions, interviewing a very knowledgeable colleague of mine but more on that later. that will come in due course. We’ll look at those specialist human analysis techniques. But there’s been a couple of conceptual models around for quite a long time, about 20 years now at least, for how to think about humans in the system.

Human-System Models

So, we’ve got a 5M model and the SHELL model. I’m just going to briefly illustrate those. Now, both models are taken from the US Federal Aviation Authority System Safety Handbook, which dates to the end of 2000. These have been around a long time and they were around before the year 2000, and they’re quite long in the tooth.

We’ve got the SHELL model, which considers our software, hardware, environments and live-ware – the human. And there’s quite a nice checklist on Wikipedia for things to consider. We’re considering all the different interfaces between those different elements. That’s at the hyperlink you can see at the bottom of the slide.

Then on the right-hand side, we’ve got the 5M model and apologies for the gendered language. Where the five Ms are the man/the human, the machine, management, the media – and the media is the environment for operating and maintenance environment – and then in the middle is the mission. the humans, the machines, the systems, and the management come together in order to perform a mission within a certain environment. that’s another very useful way of conceptualizing our contribution of humans and interaction between human and system. Human operators usually are maintainers, frontline staff, and management, all in a particular operating environment and environmental context and how they come together to accomplish the mission or the function of the system, whatever it might be.

Now a word of caution, on this. It’s possible to spend gigantic sums of money on human analysis. very often we tend to target it at the most critical points and we very often target it at the operator, particularly for those phases of operation where the operator must do things in a limited amount time. the operator will be under pressure and if they don’t take the right action within a certain time, something could go wrong. we do tend to target this analysis in those areas and tend to spend money hopefully in a sensible and targeted way.

Commentary #3

My final slide on the additional commentary. The other things we’ve talked about for this task, compliance checking. We should get a subsystem specification. If we don’t get a subsystem specification, well, what are the expectations on the subsystem? Are they documented anywhere? Is it in the consent to box? Is there an interface requirement document or are there interface control documents for other systems that or subsystems that interface with our subsystem – anywhere where we can get information. if we have a subsystem spec, a bunch of functional requirements say, early on we could do a functional failure analysis of those functional requirements. we can do this work really quite early if we need to and think about, “Well, what interfaces are expected or required from our subsystem?” versus “What is our subsystem actually do?” any mismatches that could give rise to problems.

So, this is a type of activity where we’re looking for continuity and we’re looking for coherence across the interface. And we’re looking for things to join up. And if they don’t join up or they’re mismatched, then there’s a potential problem. And, as we look down into the subsystem, are there any derived safety requirements from above that says this subsystem needs to do this or not do that in order to manage a hazard? Those are important to identify.

Again, if it’s not been done probably the subsystem contractor won’t do it because it’s extra expense. And they may well truly believe that they don’t need to. We’re all proud of the things that we do, and we feel sometimes emotionally threatened if somebody suggests a piece of kit might go wrong and it does blind people to potential problems.

If going the other way, we are a higher-level authority where a system prime contractor or something and we’ve got to look at the documentation from a subsystem supplier. Well, we might find out some information from sales brochures or feature lists, or there might be a description of the benefits or the functions of the system with its outputs. We hopefully should be able to get hold of some operating and maintenance manuals. And very often those manuals will contain warnings and cautions and say, “You must look after the piece of cake by doing this”. I’m thinking the gremlins now “Don’t feed it after midnight or get it wet” otherwise bad things will happen. Sorry about that, slightly fatuous example, but a good illustration, I think. And ideally, if there’s any training materials associated with the piece of kit, is there a training needs analysis that shows how the training was developed? It’s very often in a TNA if it’s done well, there’s lots of good information in there. Even if it’s not quite for the same application that weighs in the piece of kit for, you could learn a lot from that kind of stuff

And finally, if all else fails, if you’ve got a legacy piece of kit, then you can physically inspect it. And if you can take it apart, put it back together again – do so. You might discover there’s asbestos in it. You might discover that lithium batteries or whatever it might be, fire hazards, flammable materials, toxic materials, you name it. there’s a lot of ways that we can get information about the subsystem. Ideally, we ask for everything upfront. Say, you know, if there’s any hazardous chemicals in there, then you must provide the hazard sheets and the hazard data in accordance with international or national standards and so on and so forth. But if you can’t get that or you haven’t asked for it, there are other ways of doing it, but they’re often time-consuming and not the optimal way of doing it.

So again, do think about what you need upfront and do ask for it. And if the contractor can’t supply exactly what you want, what you need, you then have to decide whether you could live with that, whether you could use some of these alternative techniques or whether you just have to say, “No, thanks. I’ll go to another supplier of something similar”. And I may have to pay more for it, but I’ll get a better-quality product that actually comes with some safety evidence that means I can actually integrate it and use it within my system. Sometimes you do have to make some tough decisions and the earlier we do those tough decisions the better, in my experience.

Copyright Statement

So that’s all the technical content. Just to say that all the text that’s in italics and in speech marks is from the standard, which is copyright free. But this presentation, and especially all the commentary and the added value, is copyright at the Safety Artisan 2020.

For More …

And if you want more videos like this, rest in the 882 series and other resources on safety topics, you can find them at the website www.safetyartisan.com. And you can also go to the safety artisan page at Patreon. that’s www.pateron.com and search for Safety Artisan – all one word.

End

So, that’s the end of the presentation and it just remains for me to say, thanks very much for watching and supporting the Safety Artisan. And I’ll be doing Task 205 system hazard analysis next in the series, look forward to seeing you again soon. Goodbye, everyone.

Back to the Home Page | Mil-Std-882 Page | System Safety Page

Mil-Std-882E Sub-System Hazard Analysis (Task 204)

This is Mil-Std-882E Sub-System Hazard Analysis (SSHA).
Back to: 100-series Tasks.

The 200-series tasks fall into several natural groups. Task 203 address the identification and analysis of safety requirements at multiple levels.

In the video lesson, The Safety Artisan looks at Sub-System Hazard Analysis, or SSHA, which is Task 204 in Mil-Std-882E. We explore Task 204’s aim, description, scope and contracting requirements. We also provide value-adding commentary and explain the issues with SSHA – how to do it well and avoid the pitfalls.

The text from the standard follows:

“SUBSYSTEM HAZARD ANALYSIS

204.1 Purpose. Task 204 is to perform and document a Subsystem Hazard Analysis (SSHA) to verify subsystem compliance with requirements to eliminate hazards or reduce the associated risks; to identify previously unidentified hazards associated with the design of subsystems; and, to recommend actions necessary to eliminate identified hazards or mitigate their associated risks.

204.2 Task description. The contractor shall perform and document an SSHA to identify hazards and mitigation measures in components and equipment. This analysis shall include Commercial-Off-the-Shelf (COTS), Government-Off-the-Shelf (GOTS), Government-Furnished Equipment (GFE), Non-Developmental Items (NDI), and software. Areas to consider include performance, performance degradation, functional failures, timing errors, design errors or defects, and inadvertent functioning. While conducting this analysis, the human shall be considered a component within a subsystem, receiving both inputs and initiating outputs.

204.2.1 At a minimum, the analysis shall:

a. Verify subsystem compliance with requirements to eliminate hazards or reduce the associated risks.

(1) Validate applicable flow-down of design requirements from top-level specifications to detailed design specifications for the subsystem.

(2) Ensure design criteria in the subsystem specifications have been satisfied and that verification and validation of subsystem mitigation measures have been included in test plans and procedures.

b. Identify previously unidentified hazards associated with the design of subsystems.

(1) Ensure implementation of subsystem design requirements and mitigation measures have not introduced any new hazards.

(2) Determine modes of failure, including component failure modes and human errors, single point and common mode failures, the effects when failures occur in subsystem components, and from functional relationships between components and equipment comprising each subsystem. Consider the potential contribution of subsystem hardware and software events (including those developed by other contractors/sources, COTS, GOTS, NDIs, and GFE hardware or software), faults, and occurrences (such as improper timing).

c. Recommend actions necessary to eliminate previously unidentified hazards or mitigate their associated risk. Ensure system-level hazards attributed to the subsystem are analyzed and adequate mitigations of the potential hazards are implemented in the design.

204.2.2 If no specific analysis techniques are directed or if the contractor recommends a different technique than that specified by the Program Manager (PM), the contractor shall obtain PM approval of techniques to be used before performing the analysis.

204.2.3 When software to be used in conjunction with the subsystem is developed under a separate software development effort, the contractor performing the SSHA shall monitor, obtain, and use the output of each phase of the formal software development process in evaluating the software contribution to the SSHA. Hazards identified that require mitigation action by the software developer shall be reported to the PM in order to request appropriate direction be provided to the software developers.

204.2.4 The contractor shall update, as necessary, the SSHA following system design changes, including software design changes.

204.2.5 The contractor shall prepare a report that contains the results from the task described in paragraph 204.2 and includes:

a. System description. This summary describes the physical and functional characteristics of the system, a list of its subsystems, and a detailed description of the subsystem(s) being analyzed, including its boundaries. Reference to more detailed system and subsystem descriptions, including specifications and detailed review documentation, shall be supplied when such documentation is available.

b. Hazard analysis methods and techniques. Provide a description of each method and technique used in conduct of the analysis. Include a description of assumptions made for each analysis and the qualitative or quantitative data used.

c. Hazard analysis results. Contents and formats may vary according to the individual requirements of the program and methods and techniques used. As applicable, analysis results should be captured in the Hazard Tracking System (HTS).

204.3. Details to be specified. The Request for Proposal (RFP) and Statement of Work (SOW) shall include the following, as applicable:

a. Imposition of Task 204. (R)

b. Identification of functional discipline(s) to be addressed by this task. (R)

c. Identification of subsystem(s) to be analyzed.

d. Desired analysis methodologies and technique(s), and any special data elements, format, or data reporting requirements (consider Task 106, Hazard Tracking System).

e. Selected hazards, hazardous areas, or other specific items to be examined or excluded.

f. COTS, GOTS, NDI, and GFE technical data to enable the contractor to accomplish the defined task.

g. Concept of operations.

h. Other specific hazard management requirements, e.g., specific risk definitions and matrix to be used on this program.

Forward to the next excerpt: Task 205

Back to the Home Page | Mil-Std-882 Page | System Safety Page

Mil-Std-882E Safety Requirements Hazard Analysis (Task 203)

This is Mil-Std-882E Safety Requirements Hazard Analysis (SRHA).
Back to: 100-series Tasks.

The 200-series tasks fall into several natural groups. Task 203 address the identification and analysis of safety requirements at multiple levels.

In the 45-minute video, The Safety Artisan looks at Safety Requirements Hazard Analysis, or SRHA, which is Task 203 in the Mil-Std-882E standard. We explore Task 203’s aim, description, scope and contracting requirements. SRHA is an important and complex task, which needs to be done on several levels to be successful. This video explains the issues and discusses how to perform SRHA well.

The text from the standard follows:

SYSTEM REQUIREMENTS HAZARD ANALYSIS

203.1 Purpose. Task 203 is to perform and document a System Requirements Hazard Analysis (SRHA) to determine the design requirements to eliminate hazards or reduce the associated risks for a system, to incorporate these requirements into the appropriate system documentation, and to assess compliance of the system with these requirements. The SRHA addresses all life-cycle phases and modes.

203.2 Task description. The contractor shall perform and document an SRHA to:

203.2.1 Determine system design requirements to eliminate hazards or reduce the associated risks by identifying applicable policies, regulations, standards, etc. and analyzing identified hazards.

a. The contractor shall identify applicable requirements by reviewing military and industry standards and specifications; historical documentation on similar and legacy systems; Department of Defense (DoD) requirements (to include risk mitigation technology requirements); system performance specifications; other system design requirements and documents; applicable Federal, military, State, and local regulations; and applicable Executive Orders (EOs) and international agreements.

b. The contractor shall recommend appropriate system design requirements to eliminate hazards or reduce the associated risks identified in accordance with Section 4 of this Standard.

c. The contractor shall define verification and validation approaches for each design requirement to eliminate hazards or reduce associated risk.

203.2.2 Incorporate approved design requirements into the engineering design documents, and hardware, software, and system test plans, as appropriate. As the design evolves, ensure applicable design requirements flow down into the system and subsystem specifications, preliminary hardware configuration item development specifications, software requirements specifications, interface requirements specifications, and equivalent documents. As appropriate, use engineering change proposals to incorporate applicable design requirements into these documents.

203.2.3 Assess compliance of the development of the system hardware and associated software with the identified requirements. The contractor shall:

a. Address requirements at all contractually required technical reviews, including design reviews (such as Preliminary Design Review (PDR) and Critical Design Review (CDR)) and the Software Specification Review. The contractor shall address the hazards, mitigation measures, means of verification and validation, and recommendations.

b. Review test plans and results for verification and validation of hardware and software compliance with requirements. This includes verification and validation of the effectiveness of risk mitigation measures.

c. Ensure that hazard mitigation information are incorporated into the operator, maintenance, user, training, logistics, diagnostic, and demilitarization and disposal manuals and plans.

203.3. Details to be specified. The Request for Proposal (RFP) and Statement of Work (SOW) shall include the following, as applicable:

a. Imposition of Task 203. (R)

b. Identification of functional discipline(s) design requirements to be addressed by this task. (R)

c. Contractor level of effort support required for design, technical, and other program reviews. (R)

d. Tailor 203.2.2 and 203.2.3 as appropriate to reflect the contractual relationship with the contractor responsible for design. (R)

e. Concept of operations.

f. Other specific hazard management requirements, e.g., specific risk definitions and matrix to be used on this program.

Forward to the next excerpt: Task 204

Back to the Home Page | Mil-Std-882 Page | System Safety Page

Professional | Pragmatic | Impartial

Transcript: System Requirements Hazard Analysis (T203)

Here is the full transcript: Systems Requirements Hazard Analysis.

The full video is here.

Introduction

Hello and welcome to the Safety Artisan, where you will find professional, pragmatic and impartial advice on all things system, safety and related.

System Requirements Hazard Analysis

And so today, which is the 1st of March 2020, we’re going to be talking about – let me just find it for you – we’ll be talking about system requirements, hazard analysis. And this is part of our series on Mil. Standard 882E (882 Echo) and this one a task 203. Task 203 in the Mil. standard. And it’s a very widely used system safety engineering standard and its influence is found in many places, not just on military procurement programs.

Topics for this Session

We’re going to look at this task, which is very important, possibly the most important task of all, as we’ll see. so in to talk about the purpose of the task, which is word for word from the task description itself. We’re going to talk about in the task description, the three aims of this task, which is to determine or work out requirements, incorporate them, and then assess the compliance of the system with those requirements, because, of course, it may not be a simple read-across. We’ve got six slides on that. That’s most of the task. Then we’ve just got one slide on contracting, which if you’ve seen any of the others in this series, will seem very familiar. We’ve got a little bit of a chat about Section 4.2 from the standard and some commentary, and the reason for that will become clear. So, let’s crack on.

Purpose of SRHA

Task 203.1, the purpose of Task 203 is to perform and document a System Requirements Hazard Analysis or SRHA. And as we’ve already said, the purpose of this is to determine the design requirements. We’re going to focus on design rather than buying stuff off the shelf – we’ll talk about the implications of that a little bit later. Design requirements to eliminate or reduce hazards and risks, incorporate those requirements, into a says, into the documentation, but what it should say is incorporate risk reduction measures into the system itself and then document it. And then finally, to assess compliance of the system with these requirements. Then it says the SRHA address addresses all life-cycle phases, so not just meant for you to think about certain phases of the program. What are the requirements through life for the system? And in all modes. Whether it’s in operation, whether it’s in maintenance or refit, whether it’s being repaired or disposed of, whatever it might be.

Task Description #1

First of six slides on the task description. I’m using more than one colour because there’s some quite a lot of important points packed quite tightly together in this description. We’re assuming that the contractor performs and documents this SRHA. The customer needs to do a lot of work here before ever gets near a contractor. More on that later. We need to determine system design requirements to eliminate hazards or reduce associated risks.

Two things here. By identifying applicable policies, regulations and standards etc. More on that later. And analysing identified hazards. So, requirements to perform the analysis as well as to simply just state ‘We want a system to do this and not to do that’. So, we need to put some requirements to say ‘Here’s what we want to be analysed, to what degree? And why.’ is always helpful.

Task Description #2

Breaking those breaking those two requirements down.

Part a. We’re going to identify applicable requirements by reviewing our military and industry standards and specs, historical documentation of systems that are similar or with a system that we’re replacing, perhaps. Look at, it’s assumed that the US Department of Defense is the customer, ultimate customer. So, the ultimate customer’s requirements, including whatever they’ve said about standard ways of mitigating certain common risks. System performance spec, that’s your functional performance spec or whatever you want to call it. Other system design requirements and documents- Bit of a catchall there. And applicable federal, military, state and local regulations.

This is a US standard. It’s a federated system, much like Australia or indeed lots of modern states, even the UK. There are variations in law across England, Wales, Scotland and Ireland. They’re not great, but they do exist. And in the US and Australia, those differences are greater. And it says applicable executive orders. Executive orders, they’re not law, but they are what the executive arm of the U.S. government has issued, and international agreements. A lot of words in there- have a look at the different statements that are in that in white, blue and yellow. Basically, from international agreements right down to whatever requirements may be applicable, they all need to be looked at and taken account of. So, there’s a huge amount of work there for someone to do. I’ll come back to who that someone should be later.

Task Description #3

Part B. It says the contractor shall recommend appropriate system design requirements. The assumption here is that the contractor is the designer and knows the design better than anybody, better than the purchaser, which is fair enough. It’s your system, you should understand it. And the requirement is that the contractor is not just passive, ‘doing as they’re told’, they’re there to actively investigate possible hazards associated with their system and recommend appropriate requirements in order to manage those hazards and risks. And then there’s further guidance here is the contractor to do that in accordance with Section 4 of Mil. Standard 882E. Now, Section 4 is the general requirements of the standards and there’s lots of good advice in that. And I’ll be doing a lesson, maybe more than one lesson in fact, in Section 4 because there is quite a lot in there. The contractor is to refer to the standard and apply the principles therein. All good stuff.

Part C. The contractor shall also define verification and validation approaches. So, the contractor shall define V and V approaches for each design requirement to eliminate hazards and reduce risks. In part C- Well, B and C- we’ve got a very much narrower focus on requirements to eliminate hazards or reduce risks. Whereas in A, notice we’ve got incredibly broad scope looking requirements. It’s not just about the narrow job of dealing with hazards and controlling them, that we’ve got in parts B and C.

Task Description #4

Onwards and upwards. We get to the second major part of this task, which is to incorporate those design requirements. It’s all very well to have them, but they’ve got to be built into the engineering design, into documentation, hardware, software, test plans, etc. And the second highlighted bit that I’ve got is ‘as the design evolves ensure applicable design requirements flow down into lower-level specifications’, etc, etc, etc. There’s a lot of repetition there, so I won’t go through it. Clearly the assumption in this standard is that the design will be done top-down and that the main contractor, design contractor, will be doing work and then identifying lower-level requirements to be passed on to subcontractors and suppliers. And again, the assumption is we’re dealing with a large military system, which is at least, in part, bespoke. It is being developed and/or integrated for the first time for a specific user and specific use.

I’ll come onto the third yellow highlighted bit first, and then it says as appropriate use engineering change proposals to incorporate applicable design requirements into these documents. What we’re saying here is that even if something hasn’t been specified upfront in the original contract, the contractor should use Engineering Change Proposals – ECP – should use it controlled change mechanism in order to change things as they go with approval and refine and evolve the design.

Years of experience have taught me that these statements are coming from the assumption – still true in the US, I believe – whereby major military projects are designed and developed under a cost-plus basis. In other words, the government pays the main contractor / the prime contractor / prime designer on a sort of time and materials basis, not on a firm or fixed price basis, but says ‘Go away and do what we say’. And there are controls there, and there’s open-book accounting to try and prevent the government from being defrauded. But basically, the contractor goes off and does what is required and gets paid for what they do. So, the government has transferred relatively low amounts of risk onto the contractor anticipating that this will result in the lowest possible overall cost of design development. Now, as we probably could know from the news, that doesn’t always work. However, that is the assumption behind this standard. This cost-plus approach will pay you to do the job and therefore we don’t have to specify every single nut and bolt in the contract right at the beginning. Which in some ways takes a lot of risks away from the purchaser because they don’t have to get everything right at the start. So that’s good. There’s always a balance of risk in whichever approach we take.

So, if we go firm price, yes, we could inject more competition into procurement and supply activity, but you’ve got to get your contract upfront right. And all your requirements, right- more or less. That is notoriously difficult to do. Whichever way you go, there are risks. But it’s important to note that this is the assumption underlying the standard. Not every standard follows this approach, follows this philosophy, but 88 2 does. So, if we’re going to use it in a different way, we need to understand the fact that in. More on that later.

Task Description #5

Fifth slide of six. Third part. We need to assess compliance of that development of hardware, software, documentation, data, etc., whatever it might be. In order to do that, the contractor is going to have to address the customer requirements at technical reviews. So again, the assumption is that development is following a systems-engineering process with certain gated reviews. So, you go into a series of reviews, you might start with system requirements review, SRR. Then you might have preliminary design review, top-level design, PDR. And then we go down to detailed design which is reviewed at Critical Design Review, or CDR. And then we might have a further software specification review for software components and then we’ll go on and test readiness routines and so on and so forth.

Mil. Standard 882 is assuming a particular systems-engineering-lifecycle approach to development. This is very widely used not just for military standards, but for civil, and all over the place. Whatever we call these reviews, the idea of a gated review is that you don’t start a review until you’ve reached maturity requirements or design. You then conduct the review against objective criteria and then decide whether the review has passed. Now, usually, there is a hefty payment milestone associated with passing review. The contractor is incentivized to pass the review. And hopefully, if we’ve got the requirements right, a passed review means we’re on the right track and we’re getting the right product. But that’s not always the case that we’ve got to get all these things right.

And then it says during those reviews, the contractor shall address hazards, mitigation measures or controls and methods of V and V, and recommendations arising. A lot goes on at these reviews. They are on big programs, especially, the very important, very high stress. And in fact, in Australia now, there are some projects that are so big that a delay in a PDR review actually made it into the national news on the future submarine because it’s such a huge multi-billion-dollar project. It could all get very painful and political as well.

Task Description #6

However, let’s move on to the final slide of the task description. So, A. was is do the reviews. B. is review test plans and review test results to make sure to verify and validate hardware and software compliance with those requirements. And as it says, this includes V and V of the effectiveness of risk mitigation measures. So, we need to test these risk controls where we can and see how effective they are and whether they live up to the requirements or the assumptions that we’ve made. Now, again, this is an American standard, so it’s very ‘test centric’. The American government likes to test things to death and depending on your point of view, that’s sensible or not, it’s sensible in the sense that you’re testing a real system hopefully in a representative test environment. Although it may not be representative of the operational environment. So, it should be a very solid, robust, valid approach to proving a system.

However, there is a downside to testing in that it’s very expensive and it tends to come at the end of a program. Whereas really you need an indication much earlier on if things are going astray. So, you really need to review documentation and do analysis and so forth. Or maybe you test a prototype for some samples or something early on, rather than waiting until yet when it’s often may be too late and then very expensive to fix things.

And then part C, we need to ensure that hazard control information is incorporated into manuals and plans, whether it be for the operator, the maintainer, the trainer, the logistician, the diagnostics or indeed for the final disposal. We need to take that hazard control information, risk control information, and record it so that it doesn’t get lost and it gets to the people who need it. That’s very important.

OK, so we’ve spent quite a lot of time going through the description because it’s a big, complex task this one, as you can see, with three major parts to it. It’s worth just going back over it. We’ve got our top-level description on slide one, which summarizes the whole thing. We’re talking about finding those requirements, identifying them. We’re talking about the contractor as an active recommender and developer of requirements and actively developing the V and V techniques to make sure that they are met.

In the second major part, we’re talking about incorporating those design requirements as the design evolves and using a controlled change method to make sure that we keep up with what’s going on. We’re talking about assessing compliance both at major systems engineering reviews and during testing. And then finally, we’re talking about making sure that the required information gets through to those who need it at the end of the food chain, as it were. [This is ] all important stuff.

Contracting

Here’s as a page we should be familiar with by now, contracting. We need to require SRHA, Task 203.  We need to put it in the request for proposal and the contractual state, the work. So once again, as I’ve said before, we’ve got to get this stuff in early on. At least the requirement to do it, even if we haven’t fully worked everything out. We need to get that in right at the start of the request for proposal. We need to require task 203 to be done. It’s imposed (A. Imposition of Task 203).

We need to identify (B. Identification of functional disciplines) who we want to take part in it because it’s not, as we will see, it’s not just the discipline and the job of the safety engineers or the safety team to do this. The design engineers, the specialist engineers in reliability, maintainability and testability, whoever, they all need to be involved as well, etc, etc.

Contractor level of effort (C.) for reviews and so on. We may need to specify some hard requirements there to ensure that we get early scrutiny of the product and the design.

A big point is tailoring of the task (D. Tailor 203.2 and 203.2.3 as appropriate). The task may need to be tailored assuming again that the contractor is responsible for the design. Maybe if the prime contractor isn’t responsible for the design, maybe we’re contracting somebody to buy something that’s mostly off the shelf and then operating force for 30 years. Let’s say a so-called turnkey solution. And we might do that for a piece of military kit, or we might do that for a hospital, or whatever it might be. A piece of infrastructure, a service, whatever. So, it may be that the contractor who must do most of task 203 is not the Prime at all. But, the prime needs to pass those requirements down to some key subcontractors who are doing the development stuff. So, it’s not a given that the prime contractor right underneath the customer must do all this stuff. It may have to be done at several different levels.

And again, we’ve got to provide the concept of operations (E.), that gives the context for all this work. Otherwise, it gets very difficult to do it. You’ve got to say, ‘What’s the jurisdictional context?’ ‘Where will we be operating under?’ ‘Which rules and conditions?’ As well as everything else that you would find in Con. Ops (Concept of Operations).

Then if there are any specific hazard management requirements (F.) that need to be imposed and specific measures of risk, then they need to be passed on to the contractor as well. This is how we will assess, and measure, and prioritize risks. That needs to be done for the program otherwise, you can end up with lots of different ways doing it and it becomes difficult to govern mess.

Section 4.2 #1

I promised we would have a little section on Section 4.2 in the standard and I’ve got two slides here that say two important things. We’re not going to go through all of Section 4 of the 882- That’s for another session. But here in 4.2, we’ve got two important things.

It says Section 4 defines system safety requirements through life for any system. And when properly applied, these requirements should enable the identification and management of hazards and their associated risks. Not only during system development but also during sustainment. And any engineering activities that go on in sustainment, whether it be repair, overhaul, modification, update, whatever it might be. These requirements are put in place to enable that good work to take place and make predictions for the through-life operation, support, sustainment of system, whatever it might be.

Section 4.2 #2

And then secondly, there’s another important point here, which I alluded to earlier. System safety staff are not responsible for hazard management in other functional disciplines. If you’re a structural designer, you’re responsible for making your structure or designing your structure such that risks of failure and collapse and catastrophe are managed. And the same for everything else. Whatever it is you’re dealing with, propulsion, fuels, you name it, whatever the discipline is, they’re all responsible for managing the risks.

The safety team is there really to pull it together and try and ensure some consistency and honesty and to report status. They are not there to do it all for the designers. Indeed, they can’t because they will not have the design specialist knowledge to do so. Only the designers can do. But it does go on to say all functional disciplines, using this generic methodology that’s in Section 4, should coordinate their efforts as part of the overall systems engineering process. The standard provides standardization and it should force all these different disciplines to work together in a standardized way following a standardized-systems-engineering process. And remember we said earlier, Mil. standard 882 assumes that there is a higher-level systems-engineering process going on into which the safety program fits. And that’s very, very important.

On so many programs I’ve seen, there’s either no systems engineering process or a weak one. Or the safety program is divorced or isolated from the systems engineering, the higher-level program, and as a result, it can become irrelevant if you’re not careful. So, having these things and making sure that they lock together is very important. And the reasoning given here is because you might mitigate a hazard in one discipline only to make it worse for somebody else. We can all think of examples of one (which is code for me saying I can’t right now). But anyway, trade-offs – that’s what we end up with. There’s Section 4.2, which gives us a little insight into the thrust of the whole of section 4.

Commentary #1

Just two slides of commentary for me. First, it’s worth remembering that there are lots, and lots, and lots of requirements. We’ve got requirements of the standard itself, which is about following a rigorous process. We’ve got law at the international and national levels, and whether those laws apply in a particular jurisdiction or not can be complex. You’ve got product specifications; you’ve got applicable standards, or maybe only parts of the standards that are applicable to your system. And then you’ve got program project requirements, etc., etc. You’ve got lots and lots of layers of requirements that are out there and may or may not be relevant to your system you want to develop, or service, whatever it is going to be. But of course, if we’re using this kind of approach, it’s going to be a complex system or service. It’s going to be challenging to find and identify all these things. It’s going to take some dedicated effort.

That’s one issue, doing all that work. And this is not a trivial exercise and I’ve seen it done badly far more often than I’ve seen it done well. That’s the thing to bear in mind, this is not easy to do. And people didn’t really want to do it – it’s hard work.

And then secondly, we get down to what we might call derived safety requirements. We have a high-level requirement that says, ‘We want a very high level of performance out of this vehicle’ or whatever it might be. And that very demanding performance requirement might force us to use some very high energy fuel, or it might force us to pack a lot of power and a lot of equipment into a very small space, and these requirements can lead to sort of secondary hazards. So, we’ve got high energy fuel inside the vehicle- Well, clearly, that’s dangerous if it leaks. We’ve got a lot of stuff, complex stuff, packed into a small system that can give us thermal control problems. Or if a bit of it goes wrong, if it’s tightly packed together, it can take out something else next to it.

So, these performance requirements can cause hazards that probably weren’t there before or needn’t have been there in, let’s say, a common or garden system that doesn’t have to perform as well. So, we might well look at doing some analysis on our requirements and our top-level design or conceptual design, whatever it might be very early on. And we might say, ‘Well, clearly this is going to drive us down a particular path’ and therefore we will derive some additional safety requirements to deal with these challenges. They don’t come out straight out of higher-level requirements, they’re a secondary effect. But in complex systems, these are very common. And if we’re doing our systems engineering well, we will identify, derive safety requirements for ourselves and for the next level of contractors down the chain.

So, instead of just passing on ‘back-to-back’ requirements from the ultimate customer, which may not mean anything at all to the component supplier (in fact, it probably won’t). We need to change these top-level requirements and say, ‘What’s relevant for you as the supplier role of the engine?’ Let’s say or the wheels, or the wings, or the hull, or whatever it might be. We need to pass on required controls, whether it be the prevention of hazards, detection or mitigation. We also need to remember the order of precedence. It’s preferable to eliminate hazards if we can’t, we put in engineering- engineered features- to reduce the risk or lessen the probability, or severity, etc. And those rules are in section 4.3.4 of the Mil. Standard. There’s a lot of work to do on requirements on many different levels and it may be that this task must be repeated at many different levels.

Commentary #2

But the first level task must be done by the client, and actually by the ultimate end-user because to mangle a famous quote, ‘What you don’t specify – what you don’t see can hurt you’. So, we need to do this work as end-users, and as purchases, as customers. It is tempting to assume that the contractors will just do it, that they’ll just get it. ‘They’ve been making planes for years’ or ‘They’ve been making tanks’, or boots, or guns, or ships, or whatever it might be. ‘They’ve been making fuel for years’, ‘these chemicals for years’. We just assume that they know what they’re doing. Well, they probably do know what they’re doing within a particular context. However, if we impose competition, as we always do because we’re always looking for value for money, and whether we have a competition where we’re asking for a firm price to do something or whether we employ other methods of competition and cost-cutting, that will always be pressure on the contract costs. And that means they will be tempted to tailor the safety approach they’re taking in order to reduce costs. Which is a perfectly legitimate thing to do, nothing immoral about doing that, if it’s done appropriately and sensibly.

But if you as the customer or client are going to incentivize your suppliers to do that, you need to be aware of that and the fact that may just not bother because you haven’t told them to. You’re not contractually specified it so you aren’t going to get it. It’s not their problem. And indeed, the suppliers may not understand how their customer will integrate what they provide or use it. The prime contractor may not have a great idea as to how you’re going to use their product. And you can be certain that the subcontractors and the low level secondary and tertiary suppliers are probably going to have no clue whatsoever about what’s going to happen to their components. They are just not going to know. So, you need to specify that as purchaser and you need to make sure that your immediate suppliers pass on those requirements, and that context, and that they police the contract appropriately. Otherwise, there’s going to be trouble for the ultimate client and end-user.

And then finally, in these days of globalization and business-to-business and international procurement, you may be – probably are – buying stuff that’s been made abroad and designed in another country where they may have completely different laws or no laws at all on how safety is built-in – designed in – to a system. And of course, you don’t always know where design work is going to get done; just because you engage a prime contractor in your own country and think that you’re safe. You don’t know whether the prime contractor is going to subcontract software development – let’s say, out to India. It’s so common it’s a cliché! But there are certain things that tend to be done offshore because it’s cheaper, or quicker, or whatever. Or because somebody has already got a system that you can just plug in and use – allegedly.

There are all kinds of reasons why your supply chain will not necessarily ‘Just get it’, or ‘Just do it”’. In fact, there are lots of good reasons why they won’t. So, the purchaser has got to do a lot of work. It’s critical for the purchaser to know what their obligations are because a lot of purchasers don’t. They sit there in blithe ignorance of what their safety responsibilities are, and the lucky ones get away with it. And the unlucky ones are either killed or maimed, or they kill or maim somebody else and they end up going to jail or massive fines. But you’ve not only got to understand the requirements, the obligations, safety on the end item being used but how do you translate that to the contractors, because it’s not always obvious. You can’t just say, ‘Well, these are the laws that I have to obey- I’ll just pass those on to you, Mr Contractor’ because they may not apply to the contractor if they’re in a different country.

Or it just may not make any sense at their level. Laws that were designed to protect people will not often make much sense to a component supplier. Just doesn’t work. Two important points there on the commentary. Lots of layers of requirements that need to be worked on. This is all classic systems engineering stuff, isn’t it? And then the purchaser and the end-user cannot evade their responsibilities at the top of the food chain. Indeed, they’ll be stuck with the problem, whatever it is, for 30 years or however long they use the system.

It’s important for the end-user and the ultimate client to do this work may be several times at many different layers.

Copyright Statement

Well, that’s the end of the technical content. I just wanted to say that I’ve quoted a lot of text from the Mil, standard, which is itself copyright-free, and it’s available for free online, including on the Web site the Safety Artisan. But this presentation’s copyright of the Safety Artisan 2020.

For More …

And for more resources and for more videos like this one, please go to either www.safetyartisan.com or go to the Safety Artisan page at www.patreon.com.

Well, that is the end of the presentation. And it just remains for me to say thanks again for watching and do look out for the next sessions in the series on 882 echo (882E). There are quite a few to go. We’re going to go through all the tasks and the general and specific requirements of the standard and the appendices. We will also talk about more advanced topics, about how we manage and apply all this stuff.

So, from The Safety Artisan.com, thanks very much and goodbye.

Back to the Home Page | Mil-Std-882 Page | System Safety Page

Professional | Pragmatic | Impartial

Transcript: Preliminary Hazard Analysis (T202)

Here is the full transcript: Preliminary Hazard Analysis.

The full video is here.

Preliminary Hazard Analysis

Hello and welcome to the Safety Artisan, where you’ll find professional, pragmatic and impartial safety training resources. So, we’ll get straight on to our session and it is the 8th February 2020.  

Now we’re going to talk today about Preliminary Hazard Analysis (PHA). This is Task 202 in Military Standard 882E, which is a system safety engineering standard. It’s very widely used mostly on military equipment, but it does turn up elsewhere.  This standard is of wide interest to people and Task 202 is the second of the analysis tasks. It’s one of the first things that you will do on a systems safety program and therefore one of the most informative. This session forms part of a series of lessons that I’m doing on Mil-Std-882E.

Topics for This Session

What are we going to cover in this session? Quite a lot! The purpose of the task, a task description, recording and scope. How we do risk assessments against Tables 1, 2 and 3. Basically, it is severity, likelihood and the overall risk matrix.  We will talk about all three, about risk mitigation and using the order of preference for risk mitigation, a little bit of contracting and then a short commentary from myself. In fact, I’m providing commentary all the way through. So, let’s crack on.

Task 202 Purpose

The purpose of Task 202 is to perform and document a preliminary hazard analysis, or PHA for short, to identify hazards, assess the initial risks and identify potential mitigation measures. We’re going to talk about all of that.

Task Description

First, the task description is quite long here. And as you can see, I’ve highlighted some stuff that I particularly want to talk about.

It says “the contractor” [does this or that], but it doesn’t really matter who is doing the analysis, and actually, the customer needs to do some to inform themselves, otherwise they won’t really understand what they’re doing.  Whoever does it needs to perform and document PHA. It’s about determining initial risk assessments. There’s going to be more work, more detailed work done later. But for now, we’re doing an initial risk assessment of identified hazards. And those hazards will be associated with the design or the functions that we’re proposing to introduce. That’s very important. We don’t need a design to do this. We can get in early when we have user requirements, functional requirements, that kind of thing.

Doing this work will help us make better requirements for the system. So, we need to evaluate those hazards for severity and probability. It says based on the best available data. And of course, early in a program, that’s another big issue. We’ll talk about that more later. It says including mishap data as well, if accessible: American term mishap, it means an accident, but we’re avoiding any kind of suggestion about whether it is accidental or deliberate.  It might be stupidity, deliberate, whatever. It’s a mishap. It’s an undesirable event. We look for accessible data from similar systems, legacy systems and other lessons learned. I’ve talked about that a little bit in Task 201 lesson about that, and there’s more on that today under commentary. We need to look at provisions, alternatives, meaning design provisions and design alternatives in order to reduce risks and adding mitigation measures to eliminate hazards. If we can all reduce associated risk, we need to include all of that. What’s the task description? That’s a good overview of the task and what we need to talk about.

Reading & Scope

First, recording and scope, as always, with these tasks, we’ve got to document the results of the PHA in a hazard tracking system. Now, a word on terminology; we might call hazard tracking system; we might call it hazard log; we might call it a risk register. It doesn’t really matter what it’s called. The key point is it’s a tracking system. It’s a live document, as people say, it’s a spreadsheet or a database, something like that. It’s something relatively easy to update and change. And, we can track changes through the safety program once we do more analysis because things will change. We should expect to get some results and to refine them and change them as time goes on. Very important point.

Scope #1

Scope. Big section this. Let me just check. Yes, we’ve got three slides on the scope. This does go on and on. The scope of the PHA is to consider the potential contribution from a lot of different areas. We might be considering a whole system or a subsystem, depending on how complex the thing is we’re dealing with. And we’re going to consider mishaps, the accidents and incidents, near misses, whatever might occur from components of the system (a. System components), energy sources (b. Energy sources), ordnance (c. Ordnance)- well that’s bullets and explosives to you and me, rockets and that kind of stuff.

Hazardous materials (d. Hazardous Materials (HAZMAT)), interfaces and controls (3. Interfaces and controls), interface considerations to other systems (f. Interface considerations to other systems when in a network or System-of-Systems (SoS) architecture), external systems. Maybe you’ve got a network of different systems talking to each other. Sometimes that’s called a system of systems architecture. Don’t worry about the definitions. Our system probably interacts and talks to other systems, or It relies on other systems in some way, or other systems rely on it. There are external interfaces. That’s the point.

Scope #2

We might think about material compatibilities (g. Material Compatibilities) – Different materials and chemicals are not compatible with others- inadvertent activation (h. Inadvertent activation).

Now, I’ve highlighted I. (Commercial-Off-the-Shelf (COTS), Government-Off-the-Shelf (GOTS), Non-Developmental Items (NDIs), and Government-Furnished Equipment (GFE).) because it’s something that often gets neglected. We also need to think about stuff that’s already been developed. The general term is NDIs and it might be commercial off the shelf, it might be a government off the shelf system, or government-furnished equipment  GFE- doesn’t really matter what it is. These days, especially, very few complex systems are developed purely from scratch. We try and reuse stuff wherever we can in order to keep costs down and schedule down.

We’re going to need to integrate all these things and consider how they contribute to the overall risk picture. And as I say, that’s not often done well. Well, it’s hardly ever done well. It’s often not done at all. But it needs to be, even if only crudely. That’s better than nothing.

J. (j. Software, including software developed by other contractors or sources.  Design criteria to control safety-significant software commands and responses (e.g., inadvertent command, failure to command, untimely command or responses, and inappropriate magnitude) shall be identified, and appropriate action shall be taken to incorporate these into the software (and related hardware) specifications)  we need to include software, including software developed elsewhere. Again, that’s very difficult, often not done well. Software is intangible. If somebody else has developed it maybe we don’t have the rights to see the design, or code, or anything like that. Effectively it’s a black box to us. We need to look at software. I’m not going to bother going through all the blurb there.

Another big thing in part k (k.  Operating environment and constraints) is we need to look at the operating environment. Because a piece of kit that behaves in a certain way in one environment, you put it in a different environment and it behaves differently. And it might become much more dangerous. You never know. And the constraints that we put under on the system. Operating environment is very big. And in fact, if you see the lesson I did on the definition of safety, we can’t really define whether a system is safe or not until we define the operating environment. It’s that important, a big point there.

Scope #3

And then the third slide of three procedures (l. Procedures for operating, test, maintenance, built-in-test, diagnostics, emergencies, explosive ordnance render-safe and emergency disposal). Again, these are well these often don’t appear until later unless of course, we’ve gone off the shelf system. But if we have got off the shelf system; there should be a user manual, there should be maintenance manuals, there should be warnings and cautions, all this kind of stuff. So, we should be looking for procedures for all these things to see what we could learn from them. We want to think about the different modes (m. Modes) of operation of the system. We want to think about health hazards (n. Health hazards) to people, environmental impacts (o. Environmental Impacts), because they take to includes environmental.

We need to think about human factors, human engineering and human error analysis (p. Human factors engineering and human error analysis of operator functions, tasks, and requirements). And it says operator function tasks and requirements, but there’s also maintenance and disposal of storage. All the good stuff. Again, Human Factors is another big issue. Again, it’s not often done well, but actually, if you get a human factor specialist statement early, you can do a lot of good work and save yourself a lot of money, and time, and aggravation by thinking about things early on.

We need to think about life support requirements (q.  Life support requirements and safety implications in manned systems, including crash safety, egress, rescue, survival, and salvage). If the system is crewed or staffed in some way, I’m thinking about, well, ‘What happens if it crashes?’ ‘How do we get out?’ ‘How do we rescue people?’ ‘How do we survive?’ ‘How do we salvage the system?’

Event-unique hazards (r. Event-unique hazards). Well, that’s kind of a capsule for your system does something unusual. If it does something unusual you need to think about it.

And then thinking about part s. infrastructure (s.  Built infrastructure, real property installed equipment, and support equipment), property installed equipment and support equipment in property and infrastructure.

And then malfunctions (t. Malfunctions of the SoS, system, subsystems, components, or software) of all the above.

I’m just going to whizz back and forth. We’ve got to sub-item T there. We’ve got an awful lot of stuff there to consider. Now, of course, this is kind of a hazard checklist, isn’t it? It’s sort of a checklist of things. We need to look at all that stuff. And in that respect, that’s excellent, and we should aim to do something on all of them just to see if they’re relevant or not if nothing else. The mistake people often make is because they can’t do something perfect and comprehensive, they don’t do anything. We’ve got a lot of things to go through here. And it’s much better to have a go at all these things early and do a bit of rough work in order to learn some stuff about our system. It’s much better to do that than to do nothing at all. And with all of these things, it may be difficult to do some of these things, the software, the COTS, things where we don’t have access to all the information, but it’s better to do a little bit of work early than to do nothing at all waiting for the day to arrive when we’ll be able to do it perfectly with only information. Because guess what? That day never comes! Get in and have a go at everything early, even if it’s only to say, ‘I know nothing about this subject, and we need to investigate it.’ That’s the pros and cons of this approach. Ideally, we need to do all these things, but it can be difficult.

Risk Assessment

Moving on. Well, we’ve looked to a broad scope of things for all the hazards that we identify and there are various techniques you can use. The PHA has got to include a risk assessment. That means that we’ve got to think about likelihood and severity and then that gives us an overall picture of risk when we combine the two together. That’s tables 1 and 2.

And then, forget risk assessment codes I’m not sure why that’s in there, table 3 is the risk matrix and 88 2 has a standard risk matrix. And it says to use that unless you’ve got a tailored matrix for your system that’s been approved for use. And in this case, it says approved effectively in accordance with the US Department of Defence. But it’s whoever is the acquiring organization, the authority, the customer, the purchaser, whatever you want to call it, the end-user. We’ll talk about that more in a sec.

Table I, Severity

Let’s start by looking at severity, which in many ways is the easiest thing to look at. Now, here we’ve got in this standard we’ve got an approach based on harm to people, harm to the environment, and monetary loss due to smashing stuff up. At the top catastrophic accident. Category 1 is a fatal accident. This accident could result in death, permanent total disability, irreversible significant environmental impact, or monetary loss. And in this case, it says $10 million. Well, this, that’s 10 million US dollars. This standard was created in 2012, this version of the standard, probably inflation has had an effect since then. And a critical accident, we could cause partial disability injuries or occupational illness that can hospitalized three people are reversible. Significant environmental impact or some losses between 1 million and 10. And then we go down to marginal. Injury or hospital, lost workdays for one person, reversible moderate environmental impact or monetary loss between $100,000 and one million dollars. And then finally negligible is less than that. Negligible is an injury or illness that doesn’t result in any lost time at work, minimal environmental impact, or a monetary loss of less than a hundred thousand dollars. That’s easy to do in this standard. We just say, ‘What are the losses that we think could result?’ Worst case, reasonable scenario or an accident? That’s straightforward.

Table II, Probability

Now let’s look at probability. We’ve got a range here from ‘a’ to ‘e’, frequent down to improbable, and then F is eliminated. And eliminated in the standard really does mean eliminated. It cannot happen ever! It does not mean that we managed to massage the figures, the likelihood a probability figures, down Low that we pretend that it will never happen. It means that it is a physical impossibility. Please take note because I’ve seen a lot of abuse of that approach. That’s bad practices to massage the figures down to a level where you say, ’I don’t need to bother thinking about this at all!’ because the temptation is just to frig [massage] the figures and not really consider stuff that needs to be considered. Well, I’ll get off my soapbox now.

Let’s go back to the top. Frequent- you’ve said, for one item, likely to occur often. Down to probable- occur several times in the life of an item. Occasional- likely to occur sometimes, we think it’ll happen once in the life of an item. Remote- we don’t think it’ll happen at all, but it could do. And improbable – so unlikely for an individual item that we might assume that the occurrence won’t happen at all. But when we consider a fleet, particularly, I’ve got hundreds or thousands of items, the cumulative risk or cumulative probability, sorry, I should say, is unlikely to occur across the fleet, but it could.

And this is where this specific vs. fleet occurrence or probability is useful. For example, if we think ‘Let’s imagine a frequent hazard’. We think that something could happen to an item, per item, let’s say once a year. Now, if we’ve got a fleet of fifty of these items or fifty-something of these items, that means it’s going to happen across the fleet pretty much every week on average. That’s the difference. And sometimes it’s helpful to think about an individual system. And sometimes it’s helpful to think about a fleet where you’ve got the relevant experience to say, ‘Well the fleet that we’re replacing. We had a fleet of 100 of these things. And this went wrong every week or every month or once a year or only happened once every 10 years across the entire fleet.’ And therefore, we could reason about it that way.

We’ve got two different ways of looking at probability here. And use whichever one is more useful or helps you. But when we’re doing that, try and do that with historical data, not just subjective judgment. Because otherwise your subjective judgment, one individual might say ‘That will never happen!’, whereas another will say, ‘Well, actually we experienced it every month on our fleet!’. Circumstances are different.

Table III, Risk Matrix

We put severity and probability together. We have got ‘1’ to ‘4’ for severity, and ‘A’ to ‘F’ for probability, and we get this matrix. We’ve got probability down the side and severity along the top. And in this standard, we’ve got high risk, serious risk, medium risk and low risk. And now how exactly you define these things is, of course, somewhat arbitrary. We’ll just look at some general principles.

The good thing about this risk matrix is- First, the thing to remember is that risk is the product of probability and severity. Effectively we multiply the two together and we go, well, if we’ve got a catastrophic or critical risk. And it’s if we’ve got a more serious risk and it’s going to happen often that’s a big risk. That’s a high risk. Whereas, if we’ve got a low severity accident that we think will happen very, very rarely, then that’s a low risk. That’s great.

One thing to note here it’s easier to estimate the severity than it is the probability. It’s quite easy to under- or overestimate probability. Usually, because of the physical mechanism involved, it’s easier to estimate the severity correctly. If we look on the right-hand side, at negligible. We can see that if we’re confident that something is negligible, then it can be a low risk. But at the very most, it can only be a medium risk. We are effectively prioritizing negligible severity risks quite low down the pecking order.

Now, on the other side, if we think we’ve got a risk that could be catastrophic, we could kill somebody or do irreversible environmental damage, then, however improbable we think it is, it’s never going to be classified less than medium. That’s a good point to note. This matrix has been designed well, in the sense that all catastrophic and critical risks are never going to get the low medium and they can quite easily become serious or high. That means they’re going to get serious management attention. When you put risks up in front of a manager, senior person, a decision-maker, who’s responsible and they see red and orange, they’re going to get uncomfortable and they’re going to want to know all about that stuff. And they will want to be confident that we’ve understood the risk correctly and it’s as low as we can get it. This matrix is designed to get attention and to focus attention where it is needed.

And in this standard, in 88, you ultimately determine whether you can accept risk based on this risk rating. In 882, there is no unacceptable, intolerable risk. You can accept anything if you can persuade the right person with the right amount of authority to sign it off. And the higher the risk, the higher the level of authority you must get in order to accept the risk and expose people to it. This matrix is very important because it prioritizes attention. It prioritizes how much time and effort money gets spent on reducing risks. You will use it to rank things all the time and it also prioritizes, as we’ll see later, how often you review a risk because clearly, you don’t want to have high risks or serious risks. Those are going to get reviewed more often than a medium risk or low risk. A low risk might just get review routinely, not very often, maybe once a year or even less. We want to concentrate effort and attention on high risks and this matrix helps us to do that. But of course, no matrix is perfect.

Now, if we go back. Looking at the yellow highlight, we’re going to use table three unless there’s a tailored alternative definition, a tailored alternative matrix. Now, noting this matrix, catastrophic risk, the highest possible risk, we’ve got one death. Now, if we had a system where it was feasible to kill more than one person in an accident, then really, we would need another column worse than catastrophic. We could imagine that if you had a vehicle that had one person in it and the vehicle crashed, whatever it was, a motorbike let’s say. Let’s imagine you only said ‘We’re only going to have solo riders. We can only kill one person.’. We’re assuming we won’t hurt anybody else. But if you’ve got a car where you’ve got four or more people in, you could kill several people. If you’ve got a coach or a bus, you could drive it off a cliff and kill everybody, or you might have a fire and some people die, but most of them get out. You can see that for some vehicles, for some systems, you would need additional columns. Killing one person isn’t the worst conceivable accident.

Some systems. You might imagine quite easily, say with a ship, it’s actually very rare for a ship to sink and everybody dies. But it’s quite common for individuals on ships to die in health and safety type accidents, workplace accidents. In fact, being a merchant seaman is quite a risky occupation. But also in between those two, it’s also quite possible to have a fire or asphyxiating gases in a compartment. You can kill more than one person, but you won’t kill the entire ship’s company. Straight away in a ship, you can see there are three classes, if you like, of serious accidents where you can kill people. And we knew we should really differentiate between the three when we’re thinking about risk management. And this matrix doesn’t allow you to do that. If you’ve got a system where more than one death this is feasible, then this matrix isn’t necessarily going to serve well, because all of those types of accidents get shoved over into a catastrophic column, on this matrix, and you don’t differentiate between any of between them which is not helpful. You may need to tailor your matrix and add further columns.

And depending on the system, you might want to change the way that those risks are distributed. Because you might have a system, for example riding a bicycle. It’s very common riding a bicycle to get negligible type injuries. You know you fall off, cuts and bruises, that kind of thing. But, if you’re not on the road, let’s say you’re riding off-road it is quite rare to get utilities unless you do a mountain biking on some extreme environment. You’ve got to tailor the matrix for what you’re doing. I think we’ve talked about that enough. We’ll come back to that in later lessons, I’m sure.

Risk Mitigation

Risk mitigation, we’re doing this analysis, not for the sake of it, we’re doing it because we want to do something about it. We want to reduce the risk or eliminate it if we can. 88 2 standard gives us an order of precedence, and as it says it’s specified in section 4.3.4, but I’ve reproduced that here for convenience. Ideally, we would like to eliminate hazards by designing them. We would make a design decision to say, ‘We won’t have a petrol engine, let’s say, in this vehicle or vessel because petrol is a serious fire/explosion hazard. We’ll have something else. We’ll have diesel or we’ll have an all-electric vehicle maybe these days or something like that.’ We can eliminate the risk.

We could reduce the risk by altering the design introducing sort of failsafe features, or making the design crashworthy, or whatever it might be. We could add engineered features or devices to reduce risk safety features seatbelts in cars or airbags, roll balls, crash survivable cages around the people, whatever it might be. We can provide warning devices to say ‘Something’s going wrong here, and you need to pull over’ or whatever it is you need to do. ‘Watch out!’ because the system is failing and maybe ‘Your brakes are failing. You’ve got low brake fluid. Time to pull over now before it gets worse!’.

And then finally, the least effective precautions or mitigations signage, warning signs – because nobody reads warning signs, sadly. Procedures. Good, if they’re followed. Again, very often people don’t follow them. They cut corners. We train people. Again, they don’t always listen to the training or carry it out. And we provide PPE. That’s personal protective equipment. And again, PPE is great if you enforce it. For example, I live in Australia. If you cycle in Australia, if you ride a bicycle, it’s the law that you wear a bike helmet. Most people obey the law because they don’t want to get a $300 fine or whatever it is if the cops catch you, but you still see people around who don’t wear one. Presumably, because they think they’re bulletproof, and it will never happen to them.

PPE is fine if it’s useful. But of course, sometimes PPE can make a job so much harder that people discard it. We really need to think about designing a job to make it easy to do, if we’re going to ask people to wear awkward PPE. Also, by the way, we need to not ask them to wear PPE for trivial reasons just so that the managers can cover their backsides. If you ask people to wear PPE when they’re doing trivial jobs where they don’t need it then it brings the system into disrepute. And then people end up not wearing PPE for jobs where they really should be wearing it. You can over-specify safety and lose goodwill amongst your workers if you’re not careful.

Now those risk mitigation priorities, that’s the one in this standard, but you will see an order of precedence like that in many different countries in the law. It’s the law in Australia. It’s the law in the UK, for example, expressed slightly differently. It’s in lots of different standards for good reason because we want to design out the risks. We want to reduce them in the design because that’s more effective than trying to bolt on or stick home safety afterwards. And that’s another reason why we want to get in early in a project and think about our hazards and our risks early on. Because it’s cheaper at an early stage to say, ‘We will insist on certain things in the design. We will change the requirements to favour a design that is inherently safe.’

Contracting

We only get these things if we contract for them. The model in 88 2, the assumption is it’s a government somewhere contracting a contractor to do stuff. But it doesn’t have to be a government, it can be any client or purchase of world authority or end-user asking for something, buying something, contracting something, be it the physical system, or service, or whatever it might be. The assumption is that the client issues a request for proposal.

Right at the start, they say ‘I want a gizmo’. Or ‘I want- I don’t even want to specify that I want a gizmo. I want something that will do this job. I don’t care what it is. Give me something that will do this job.’ But even at that early stage, we should be asking for preliminary hazard analysis (PHA) to be done. We should be saying, ‘Well, who?’ ‘Which specialists?’ ‘Which functional disciplines need to be involved?’. We need to specify the data that we require and the format that it’s in. Considering, especially the tracking system, which is task 106. If we’re going to get data from lots of different people, best we get it in a standardized format we can put it all together. We want to insist that they identify hazards, hazardous locations, etc. We want to insist on getting technical data on non-developmental items, either getting it for the client or the client supplies it. Says to the contractor or doing it ‘This is the information that I’m going to supply you’ and you will use it. We need to supply the concept of operations and of course, the operating environment. Let me just check, no that that’s it. We’ve only got one slide on commentary. It doesn’t say the environment, but we do need to specify that as well, and hopefully, that should be in the concept of operations, and a specific hazard management requirement. For example, what matrix are we going to use? What is a suitable matrix to use for this system?

Now to do all of this, the purchaser, the client really probably needs to have done Task 202 and 201 themselves, and they’ve done some thinking about all of this in order to say, ‘With this system, we can envisage- with this kind of requirement, we can envisage these risks might be applicable.’ And ‘We think that the risks might be large or small’ depending on what the system is or ‘We think that-’. Let’s say if you purchase a jet fighter, jet fighters because of that demand, the overwhelming demand for performance, they tend to be a bit riskier than airliners. They fall out of the sky more often. But the advantage is that there are normally only one or two people on board. And jet fighters tend to fly a lot of the time in the middle of nowhere. You’re likely to hurt relatively few people, but it happens more often.

Whereas if you’re buying an airliner something, you can shove a couple of hundred people in at one go, those fall out of the sky much less frequently, thank goodness, but when they do, lots of people get hurt. Aa different approach to risk might be appropriate for different types of system. And when your, you should be thinking about early on, if you’re the client, if you’re the purchaser. You should have done some analysis to enable you to write a good request for proposal because if you write a bad request for proposal, it’s very difficult to recover the situation afterwards because you start at a disadvantage. And the only way often to fix it is to reissue the RFP and start again. And of course, nobody wants to do that because it’s expensive and it wastes a lot of time. And it’s very embarrassing. It is a career-limiting thing to do, a lot of people. You do need to do some work upfront in order to get your RFP correct. That’s what it says in the standard.

Commentary

I want to add a couple of comments, I’m not going to say the much. First, it’s a little line from a poem by Kipling that I find very, very helpful. And Kipling used to be a journalist and it was his job to go out and find out what the story was and report it. And to do that he used his six honest serving men. He asked ‘What?’ and ‘Why?’ and “When?’ and ‘Who?’, sorry, and ‘How?’ and ‘Where?’ and ‘Who?’. Those are all good questions to ask. If you can ask all those questions and get definite answers, you’re doing well. And a little tip here as a consultant, I rock up and one of the tricks of the trade I use is I turn up as the ‘dumb consultant’ – I always pretend to be a bit dumber than I really am- and I ask these stupid questions. And I ask the same questions to several different people. And if I get the same answer to the same question from everyone, I’m happy. But that doesn’t always happen. If you start getting very different answers to the same question from different people, then you think, ‘Okay, I need to do some more digging here’. And it’s the same with hazard analysis. Ask the what, why, when, where and who questions.

Another issue, of course, is ‘How much?’ ‘How much is this going to take?’ ‘How long is this going to take?’ ‘How many people am I going to have to invite to this meeting?’, etc. And that’s difficult. And really, the only way to answer these questions properly is to just do some PHI and PHA early and to learn from the results. The other alternative, which we are really good as human beings, is to ask the questions early to get answers that we don’t really like and then just to sweep them under the carpet and not ask those questions ever again because we’re frightened of the answers that we might. However frightened you are of the answer, you might get do ask the question because forewarned is forearmed. And if you know about a problem, you can do something about it. Even if that something is to rewrite your CV and start looking for another job. Do ask the questions even if it makes people uncomfortable. And I guess learning how to ask the questions without making people uncomfortable is one of the tricks that we must learn as safety engineers and consultants. And that’s an important part of the job. The soft skills really that you can only learn through practice, really, and observing people.

What’s the way to do it? Well, I’ve said this several times but do your PHI and PHA early. Do it as early as possible because it’s cheap to do it early. If you’re the only safety person or safety, you often in the beginning, maybe you’re a manager, maybe safety is part of your portfolio, you’ve got other responsibilities as well. Just sit down one day and ask these dumb questions, go through the checklist in Task 202 and say, ‘Do I have these things in my system?’

If you know for sure you’re not going to have explosive ordnance, or radiation, or whatever it might be, you can go, ‘Great. I can cross those off the list’. I can make an assumption or I can put a constraint in, by the way, if you really want to do it well and say ‘We will have no explosive devices’, ‘We will have no energetic materials.’, ‘We will have no radiation’ or whatever it might be. Make sure that you insist that you’ll have none of it then you can hopefully move on and never have to deal with those issues again.

Do the analysis early, but expect to repeat it because things change, and you learn more and more information comes in. But of course, the further you go down the project, the more expensive everything gets. Now, having said do it, do it early, the Catch 22 is very often people think ‘How can I analyse when I don’t have a design?’

The ‘Catch-22’ question is what comes first, design or analysis? Now, the truth is that you could do an analysis of very simple functions. You don’t need any design at all. You don’t even need to know what kind of vehicle or what kind of system you might be dealing with. But of course, that will only take you so far. And it may be that you want to do early analysis, but for whatever reason, [Intellectual Property Rights] IPR or whatever it might be, you can’t get access to data.

What do you do? You can’t get access to data about your system or the system that you’re replacing. What do you do? Well, one of the things you can do is you can borrow an idea from the logistics people. Logistic support analysis Task 203 is a baseline comparison system. Imagine that you’re going to have a new system, maybe is replacing an old system, but maybe it does a lot more than the old system used to do. Just looking at the old system isn’t going to give you the full picture. Maybe what you need to do is make up an imaginary comparison system. You take the old system and say, ‘Well, I’m adding all this extra functionality’. Maybe the old system, we just bought the vehicle. We didn’t buy the support system, we didn’t buy the weapons, we didn’t buy the training, whatever it might be. But, this time around, we’re buying the complete package. We’re going to have all this extra stuff that probably has hazards associated with it, but just doing lessons learned from the previous system will not be enough.

Maybe you need to construct an imaginary Baseline Comparison System and go, ‘I’ll borrow bits from all these other systems, put them all together, and then try and learn from that sort of composite system that I’ve invented, even though it’s imaginary.’ That can be a very powerful technique. You may get told, ‘Oh, we haven’t got the money’ or ‘We haven’t got the time to do that’. But to be honest, if there’s no other way of doing effective, early analysis, then spend the money and do it early. Because many times I’ve seen people go, ‘Oh, we haven’t got time to do that’. They’ve never got time to do it properly and therefore, you end up doing it. You go around the buoy two or three times. You do it badly. You do it again slightly less badly. You do it a third time. And it’s sort of barely adequate. And then you move forward. Well, you’ve wasted an awful lot of time and money and held up other people, the rest of the project doing that. Probably it’s better off to spend the money and just get on with it. And then you’re informed going forwards before you start to spend serious money elsewhere on the project.

Copyright Statement

Well, that’s it for me. Just one thing to say, that Mil. Standard 882E came out in 2012. Still going strong, unlikely to be replaced anytime soon. It’s copyright free. All the quotations are from the standard, they’re copyright free. But this video is copyright of The Safety Artisan 2020.

For More …

And you can find a lot more information, a lot more safety videos, at The Safety Artisan page at www.Patreon.com and you can find more resources at www.safetyartisan.com.

That is the end of the show. Thank you very much for listening. And it just remains for me to say. Come and watch some more videos on Mill-Std-882E. There’s going to be a complete course on them, and you should be able to get, I hope, a lot of value out of the course. So, until I see you again, cheers.